Stop guessing. Calculate exact cubic yardage or bag counts for your slab pour.
To ensure accuracy for your pour, this calculator uses the following engineering steps:
Always order at least 0.25 to 0.50 yards more than your minimum requirement. It is far cheaper to wash out a small amount of leftover concrete than to pay a 'short-load' delivery fee for a second truck.
Understanding typical material and installation costs is key to planning a successful contracting project. Below are regional averages for cost planning.
| Volume Required | Estimated Bagged Cost | Ready-Mix Delivered | Avg. Contractor Cost (with labor) |
|---|---|---|---|
| 1 Cubic Yard | $150 - $180 (45 bags) | $220 - $280 (Short load fee applies) | $750 - $1,100 |
| 3 Cubic Yards | $450 - $540 (135 bags) | $480 - $550 | $2,200 - $3,300 |
| 5 Cubic Yards | $750 - $900 (225 bags) | $750 - $850 | $3,500 - $5,000 |
| 10 Cubic Yards | $1,500 - $1,800 (not recommended) | $1,400 - $1,600 | $6,800 - $9,500 |